300 North pedestrian bridge in Salt Lake City to be completed by next summer Salt Lake City

300 North pedestrian bridge in Salt Lake City to be completed by next summer Salt Lake City

300 North pedestrian bridge in Salt Lake City to be completed by next summer - Axios Salt Lake CityLog InLog InAxios Salt Lake City is an Axios company.

300 North pedestrian bridge to be completed by next summer

A rendering of the 300 North bridge. Courtesy of Utah Transit Authority Construction on an $8.6 million pedestrian bridge near the FrontRunner station in Salt Lake City is on schedule after facing supply delays.The bridge, located on 300 North and approximately 500 West, is slated to be completed by July. Why it matters: Pedestrian safety is the primary objective of the bridge that will overlook five train tracks owned by Utah Transit Authority and Union Pacific Railroad, according to Carl Arky, a UTA spokesman.The nearly 200-foot-long bridge will provide a safe way to cross the tracks for residents and students at the nearby West High School. It will also improve connectivity between downtown and westside communities.Stalled trains and delays can and prompt commuters to illegally — and dangerously — cross through train cars. What they're saying: "This location is one of the highest safety concerns for Salt Lake City," said Grey Turner, UTA's manager of civil engineering and design. Details: The bridge, which is 10 feet wide, will also include oversized elevators on each side and feature a for commuters traveling via bicycle. The bottom line: A mix of federal, state and local funding is backing the project, with Salt Lake City and UTA contributing about $1.6 million. Get more local stories in your inbox with .Subscribe Support local journalism by becoming a member.

More Salt Lake City stories

No stories could be found Get a free daily digest of the most important news in your backyard with Axios Salt Lake City.Subscribe Support local journalism by becoming a member.
Share:
0 comments

Comments (0)

Leave a Comment

Minimum 10 characters required

* All fields are required. Comments are moderated before appearing.

No comments yet. Be the first to comment!

300 North pedestrian bridge in Salt Lake City to be completed by next summer Salt Lake City | Trend Now | Trend Now